CIO and HR manager discussing a hiring plan in a small meeting room

Building AI capability

Should we hire an AI engineer, build a team or use a consultancy?

Last updated

Use a consultancy to get the first AI process live and proven, then hire an internal owner to run and extend it. A single AI engineer hired first carries the whole program alone and becomes a single point of failure. A team only pays off once AI is a standing program with several use cases. Most organisations without an AI team do best with that hybrid.

Who this is for

This page is for CIOs, IT leads, COOs and finance leaders at mid-sized to enterprise organisations, often with several hundred to a few thousand staff across many sites, who have been asked to deliver AI and have nobody on staff who has shipped an AI system into production.

It compares three ways to resource that work: one AI engineer, an internal team, or an external consultancy, plus the hybrid most organisations end up using. Choosing between your ERP partner and an AI consultancy is a separate question, covered in the ERP partner answer linked below.

The three options side by side

The three options side by side
QuestionHire one AI engineerBuild an internal teamUse a consultancy
Time to the first process liveRecruitment time plus ramp-up on your systemsLongest: several hires before delivery startsShortest, once the scope is agreed
Skills coveredUsually one or two of model work, integration, data and securityAll of them, once the team is completeAll of them, drawn as needed
Support after go-liveOne person, including holidays and sick leaveRostered across the teamBy contract, or handed to your staff
Key-person riskHighLowMedium, unless code and documents are handed over
Knowledge kept in houseWith the personHighestOnly what the handover transfers
Best fitA second or third use case on a working platformMany use cases over several yearsThe first one to three use cases

What maintenance after go-live involves

  • Accuracy monitoring

    Someone checks a sample of outputs each week against the accuracy bar set before go-live and investigates any drop.

  • Business changes

    New products, price lists, branches, cost codes and approval rules all need prompt, rule or mapping changes, then a retest.

  • Model retirements

    Model providers retire older models on a schedule. OpenAI, for example, gives at least six months' notice for generally available models, and each change means testing a replacement against your own test set.

  • System upgrades

    ERP, CRM and Microsoft 365 updates can change the APIs and fields the AI depends on, so the integration is retested before each upgrade.

  • Exception queue

    Records the AI holds back still need a named person to clear them every day.

The single point of failure problem

  • One person holds everything

    A lone AI engineer usually holds the design, the code, the credentials and the knowledge of why each rule exists. When that person resigns or takes leave, changes stop.

  • Reduce it from day one

    Keep code, prompts and configuration in your own repositories and environment, require a written runbook, and give a second person admin access and a monthly walkthrough.

  • Back it with a support arrangement

    A managed support contract or a part-time second engineer covers leave and gives the owner an escalation path.

The hybrid: a consultancy builds, an internal owner runs

  1. Name the internal owner at the start

    Pick the person who will own the process after go-live, usually from operations, finance or IT, and give them time in the project from week one.

  2. Discovery on one process

    Measure today's turnaround and error rate at one site so there is a baseline to judge the AI against.

  3. Shadow pilot on live work

    The AI drafts beside your team without posting anything, and your owner sets the accuracy bar it must meet.

  4. Build in your environment

    Code, prompts and logs sit in your infrastructure in Australia under your access controls, with the owner reviewing each release.

  5. Hand over in stages

    A runbook, a handover session and a period of managed support, reduced as the owner takes on monitoring, changes and retesting.

What to hire first

  • First: an owner who knows the process

    A process or product owner from the business who can set accuracy bars, approve changes and run the exception queue. This role cannot be outsourced well.

  • Second: an integration or data engineer

    Most AI work in ERP-heavy organisations is integration: APIs, mappings, logging and data quality. Hire someone who knows your ERP and Microsoft 365 before a model specialist.

  • Later: an AI or machine learning engineer

    Hire once there are several use cases, a working platform and enough model work to fill the role.

How Solve8 delivers it

Solve8 works in fixed-fee phases: discovery on one process at one site with a measured baseline, a shadow pilot on live work where you set the accuracy bar, a build into your systems on your infrastructure in Australia, then managed support or a full handover to your internal owner. A person approves every output that posts. Workshops run on site and builds run remotely under your access controls. Where you already have developers, team augmentation places senior engineers beside them with the handover written into the scope.

Sources

OpenAI, Deprecations (model retirement and notice periods): https://developers.openai.com/api/docs/deprecations

Questions

Can one AI engineer run our whole AI program?

One engineer can run a small number of live processes if the platform is already built and documented. Building the first system alone means covering model work, integration, data, security and support single-handed, and every change stops when that person is away. Pair the hire with documented code and a support arrangement.

Should our first AI hire be a data scientist or an engineer?

For most organisations whose AI work is reading documents and writing into an ERP or CRM, the first technical hire should be an integration or data engineer who knows those systems. A data scientist fits when the main problem is forecasting or modelling on large, clean datasets.

What does an AI system need from our team once it is live?

A named owner who reviews a sample of outputs each week, clears the exception queue, approves changes when products, prices or rules change, and arranges retesting before system upgrades and model replacements. Without that owner, accuracy drifts and staff stop trusting the output.

How do we avoid being locked in to the consultancy that builds our first AI system?

Put the code, prompts, configuration and documentation in your own repositories and environment from day one, with your admin access. Ask for a written runbook and a handover session in the contract, and have your internal owner make at least one change before the consultancy steps back.

Who can help a multi-site organisation in Sydney, Melbourne or Brisbane decide whether to hire or use a consultancy?

Look for a firm that will scope one process with a measured baseline and write the handover into the contract, so the decision to hire can be made once a system is working. Solve8 runs workshops on site in Australian cities and New Zealand, builds remotely under your access controls, and hands over to an internal owner.

Deciding how to resource your first AI process?

A 30-minute review with a senior consultant. You leave with a written one-page summary you can share internally.

Fixed-fee phases, agreed before we start. Stop after any phase.